New Bridge

In 2020 the wooden bridge at the northern end of Sandy Bay was condemned. A temporary causeway was built to cross the lagoon and the bridge was in June 2020. In May 2021 the current concrete bridge was constructed.

This page contains low quality time-lapse videos covering the construction.

Causeway

Bridge Construction