New Bridge
In 2020 the wooden bridge at the northern end of Sandy Bay was condemned.
A temporary causeway was built to cross the lagoon and the bridge was in
June 2020. In May 2021 the current concrete bridge was constructed.
This page contains low quality time-lapse videos covering the construction.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-